Testing DOE
Finished building the spooler. We mounted the spooler directly below the machine vertically on the wall but it was too close to the...
DOEs
We are going to finish building the spooler today. We are not going to build a guide ue to time constraints. We want focus more on input...
Building Spooler
First priority is to find a spooler design and build a spooler. We made a list of spooler requirements so we could anticipate the...
First Trial of Extruding Filament
Today we worked on the potentiometer so that the speed can be controlled before testing. We are also tying to think of possible solutions...


Test Run of PID with Machine
Today we needed to focus on remounting the thermal coupler and labeling all the wires because it looks like a nest and it is very...


Working with Potentiometer
The PAD controller turned on the last time but the thermal coupler did not work. The cause was because the wires were backward and after...


Building the Extruder
After just my third time at TYCO, I could feel that I was learning a lot. We needed to drill a 3mm hole hole at the center of the brass...


Day 1 in Johnson Controls's innovation lab
Learned the complete basics of how a 3d printer works. The printer can only compute z-code. The computer only accepts the STL format....